DOJOCO INDUSTRIES NETWORK // LUNAR SERVICES // --:--:-- UTC
╔══════════════════════════════════════════════════════════════╗
║             LUNAR SERVICES — DOJOCO INDUSTRIES              ║
║             ARTEMIS STATION & SHACKLETON DEPOT              ║
╚══════════════════════════════════════════════════════════════╝
LUNA OPERATIONS OVERVIEW
────────────────────────
DoJoCo Lunar Services has maintained continuous operations on Luna
since 1998 — our first atmospheric scrubbing installation at what
was then a much smaller Artemis Station ran for eleven years without
a single unscheduled maintenance event. That record became the
standard every Lunar Services team since has been measured against.

Twenty-six years later, we manage the full infrastructure maintenance
portfolio for Artemis Station and Shackleton Depot: 15 MERIDIAN
atmospheric processing units across two installations, pressurization
monitoring for all habited sections, and active depot operations
serving Earth-Luna freight.

It is not the division that makes the news.
It is the division that makes the Moon livable.
═══════════════════════════════════════════════════════════════
ARTEMIS STATION — CURRENT STATUS
═══════════════════════════════════════════════════════════════
  LOCATION ....... Ring C, Level 4, Artemis Station, Luna
  DOJOCO STAFF ... 41 (full-time Luna-side)
  CONTRACTS ACTIVE  4
  MERIDIAN UNITS .  12 (Rings B & C: 9 nominal / Ring D: 3 overhaul)

  SYSTEM STATUS
  ─────────────
RING B MERIDIAN ARRAY (6 UNITS) [] 100% NOMINAL RING C MERIDIAN ARRAY (6 UNITS) [] 100% NOMINAL RING D MERIDIAN ARRAY (3 UNITS) [] 76% OVERHAUL PRESSURIZATION — ALL SECTIONS [] 100% NOMINAL ARTEMIS UPLINK [] ONLINE
  ⚠ RING D: Scheduled MERIDIAN overhaul in progress.
    Atmospheric processing capacity reduced 24%. Rings B & C
    carrying supplemental load. Estimated completion: 14 DAYS.
ARTEMIS STATION — ACTIVE CONTRACTS
────────────────────────────────────────────────────────────────
  CONTRACT                          CLIENT     STATUS       EXPIRES
  ────────────────────────────────  ─────────  ───────────  ───────
  General Maintenance — Rings A–D   ILSA       ACTIVE       2027
  Emergency Systems Standby         CMA        ACTIVE       2028
  Transit Tube Inspection Program   CMA/ILSA   ACTIVE       2026
  Ring D MERIDIAN Overhaul          ILSA       IN PROGRESS  2026
═══════════════════════════════════════════════════════════════
SHACKLETON DEPOT — CURRENT STATUS
═══════════════════════════════════════════════════════════════
  LOCATION ....... Shackleton Crater South Rim, Luna
  DOJOCO STAFF ...  6 (full-time Luna-side)
  CONTRACTS ACTIVE  3
  MERIDIAN UNITS .  3 (all nominal)

  SYSTEM STATUS
  ─────────────
MERIDIAN ARRAY (3 UNITS) [] 100% NOMINAL DEPOT SYSTEMS [] ONLINE CARGO TRANSFER SYSTEMS [] ONLINE SHACKLETON UPLINK [] ONLINE
SHACKLETON DEPOT — ACTIVE CONTRACTS
────────────────────────────────────────────────────────────────
  CONTRACT                          CLIENT      STATUS       EXPIRES
  ────────────────────────────────  ──────────  ───────────  ───────
  Depot Operations Support          Private     ACTIVE       2027
  Cold Storage & Cargo Transfer     Consortium  ACTIVE       2027
  Emergency Standby Coverage        ILSA        ACTIVE       2028
═══════════════════════════════════════════════════════════════
LUNA OPERATIONS PERSONNEL
═══════════════════════════════════════════════════════════════
Luna rotations run 12 months. Compensation is 1.6x Earth rate.
No hazard differential — Luna is the safest off-Earth posting
in the DoJoCo network. That is not an accident. It is the result
of twenty-six years of not cutting corners.

DOJOCO PERSONNEL — LUNA (TOTAL): 47
  Artemis Station .......... 41
  Shackleton Depot ..........  6

OPEN LUNA POSITIONS: See [CAREERS SECTION]