╔══════════════════════════════════════════════════════════════╗
║ DOJOCO INDUSTRIES — EMERGENCY PROTOCOLS ║
║ RESTRICTED ACCESS — AUTHORIZATION REQUIRED ║
╚══════════════════════════════════════════════════════════════╝
⚠ THIS SECTION CONTAINS RESTRICTED EMERGENCY PROTOCOLS ⚠
Access is restricted to DoJoCo personnel holding Clearance
Level 3 or above, and to designated emergency responders at
active DoJoCo installation sites.
Unauthorized access attempts are logged, timestamped, and
reported to DoJoCo Security Operations automatically.
═══════════════════════════════════════════════════════════════
AUTHENTICATION REQUIRED
═══════════════════════════════════════════════════════════════
╔══════════════════════════════════════════════════════════╗
║ NODE LOCKED — AUTHENTICATION SUSPENDED ║
╚══════════════════════════════════════════════════════════╝
Three consecutive failed authentication attempts detected.
This terminal has been placed in security lockout mode.
Authentication will resume in: 300 seconds.
─────────────────────────────────────────────────────────────
If this is an active emergency, use direct channels:
⚠ CHANNEL 7 / ATMOS-ALERT (Kasei atmospheric)
⚠ CHANNEL 7 / BREACH-ALPHA (Habitat breach)
⚠ +1-800-DJC-EMRG (Earth emergency line)
⚠ LUNA-ART-EMERGENCY (Luna emergency line)
─────────────────────────────────────────────────────────────
╔══════════════════════════════════════════════════════════════╗
║ DOJOCO INDUSTRIES — EMERGENCY PROTOCOLS ║
║ ⚠ RESTRICTED ⚠ AUTHORIZED ACCESS ONLY ⚠ ║
╚══════════════════════════════════════════════════════════════╝
EMERGENCY PROTOCOL DIRECTORY
────────────────────────────────────────────────────────────────
All protocols maintained per CMA Emergency Standards Rev. 14
and ILSA Safety Code 9.
INSTALLATIONS COVERED: KASEI (KV-1) · ARTEMIS STATION ·
SHACKLETON DEPOT · LOGICO FLEET
SELECT PROTOCOL FOR FULL PROCEDURE:
────────────────────────────────────────────────────────────────
PROTOCOL ATM-1 — ATMOSPHERIC SYSTEM FAILURE
PRIMARY ARRAY / MERIDIAN SYSTEM
════════════════════════════════════════════════════════════════
CLASSIFICATION .. CRITICAL
APPLICABLE ...... KASEI (KV-1), ARTEMIS STATION
LEAD DIVISION ... ATMOSYS
CMA NOTIFY ...... IMMEDIATE ON TIER 3 FAILURE
TRIGGER CONDITIONS
─────────────────────────────────────────────────────────────
· Primary MERIDIAN array efficiency drops below 40%
· ATMOS-CTRL panel shows CRITICAL status
· SKEIN network detects O2 threshold breach in any zone
· Automated alert: all AtmoSys personnel paged on-duty
RESPONSE PROCEDURE
─────────────────────────────────────────────────────────────
[1] Verify failure on ATMOS-CTRL panel — confirm alert
[2] Activate backup MERIDIAN supplemental units (auto)
Manual override: Junction A-9, Level -1
[3] Seal non-critical sections via Panel 7 (Zones C–F)
[4] Notify CMA immediately — CHANNEL 7 / ATMOS-ALERT
[5] Issue settlement-wide atmospheric conservation advisory
[6] Evacuate non-essential personnel to Dome 1
[7] AtmoSys technical team: begin diagnostic procedure
Reference: MERIDIAN Field Service Manual, Chapter 8
[8] Estimated recovery window: 2–6 hours (standard)
Escalation threshold: 4 hours no recovery → EVAC-1
CONTACTS
─────────────────────────────────────────────────────────────
ATMOSYS DUTY ENGINEER ... CHANNEL 7 / ATMOS-PRIMARY
DOME 1 COMMAND .......... CHANNEL 1 / COMMAND
CMA EMERGENCY ........... CHANNEL 7 / ATMOS-ALERT
────────────────────────────────────────────────────────────────
────────────────────────────────────────────────────────────────
PROTOCOL ATM-2 — ATMOSPHERIC CONTAMINATION
PRESSURE LOSS / CONTAMINANT DETECTION
════════════════════════════════════════════════════════════════
CLASSIFICATION .. CRITICAL
APPLICABLE ...... ALL INSTALLATIONS
LEAD DIVISION ... ATMOSYS / HABITECH
TRIGGER CONDITIONS
─────────────────────────────────────────────────────────────
· SKEIN sensor detects contaminant above safe threshold
· Sudden pressure drop (>0.5 kPa/min in any section)
· Occupant reports: dizziness, shortness of breath
· CO2 level above 0.1% in any habited zone
RESPONSE PROCEDURE
─────────────────────────────────────────────────────────────
[1] Identify affected section via SKEIN sensor display
[2] Seal affected section — dome shutoff valves (auto)
Manual override: HabiTech Control, Level 1
[3] Issue pressure suit advisory for all affected zones
[4] Activate emergency O2 supplementation
[5] Route occupants to adjacent unaffected dome
[6] AtmoSys: identify and isolate contamination source
[7] CMA Medical alert for any symptomatic personnel
[8] Do not unseal section until SKEIN confirms clear
CONTACTS
─────────────────────────────────────────────────────────────
ATMOSYS DUTY ENGINEER ... CHANNEL 7 / ATMOS-PRIMARY
MEDICAL CENTER .......... CHANNEL 4 / MEDICAL
CMA MEDICAL RESPONSE .... CHANNEL 7 / ATMOS-ALERT
────────────────────────────────────────────────────────────────
────────────────────────────────────────────────────────────────
PROTOCOL HAB-1 — SURFACE DOME BREACH
CARAPACE DOME STRUCTURAL FAILURE
════════════════════════════════════════════════════════════════
CLASSIFICATION .. CRITICAL
APPLICABLE ...... KASEI (KV-1), LUNA INSTALLATIONS
LEAD DIVISION ... HABITECH
TRIGGER CONDITIONS
─────────────────────────────────────────────────────────────
· Structural monitoring alarm on any surface dome
· Visible crack, deformation, or material failure
· Rapid pressure loss consistent with breach location
· CORRIDOR transit tube self-seal alert (auto-trigger)
RESPONSE PROCEDURE
─────────────────────────────────────────────────────────────
[1] Emergency dome seals activate automatically
Manual override: HabiTech Control Panel, dome level
[2] EVACUATE affected dome IMMEDIATELY
Use CORRIDOR transit tubes — self-sealing active
[3] Seal adjacent corridor connections to prevent cascade
[4] HabiTech team: deploy CORRIDOR emergency patch kit
[5] Account for ALL personnel — report to Dome 1 staging
[6] Notify CMA — CHANNEL 7 / BREACH-ALPHA
[7] Do not re-enter dome until structural team clears
NOTE: CARAPACE domes carry 50-year rated operational life.
An unscheduled breach is atypical and should be treated as
potentially indicative of a systemic issue. Request full
dome grid inspection after any breach event.
CONTACTS
─────────────────────────────────────────────────────────────
HABITECH DUTY ENGINEER .. CHANNEL 2 / HABITECH
DOME 1 COMMAND .......... CHANNEL 1 / COMMAND
CMA EMERGENCY ........... CHANNEL 7 / BREACH-ALPHA
────────────────────────────────────────────────────────────────
────────────────────────────────────────────────────────────────
PROTOCOL HAB-2 — SUBSURFACE TUNNEL COMPROMISE
BURROW NETWORK / SUBSURFACE STRUCTURAL EVENT
════════════════════════════════════════════════════════════════
CLASSIFICATION .. HIGH
APPLICABLE ...... KASEI (KV-1) SUBSURFACE NETWORK
LEAD DIVISION ... HABITECH
TRIGGER CONDITIONS
─────────────────────────────────────────────────────────────
· BURROW system structural integrity alarm triggered
· Seismic activity above 2.8 on the Martian scale
· Pressure loss detected in Level -1 or -2 corridor
· Visual: cracking, deformation, or material failure
RESPONSE PROCEDURE
─────────────────────────────────────────────────────────────
[1] BURROW auto-seal activates on structural alert
Confirm seal integrity at Level -1 Monitoring Panel
[2] Evacuate affected tunnel section via adjacent routes
[3] HabiTech structural team: inspect adjacent sections
[4] Do not transit affected section until structurally cleared
[5] If EMERGENCY SHELTER (Level -2) is compromised:
Evacuate to Dome 1 surface staging immediately
[6] Any seismic event: hold ALL surface and subsurface EVA
until seismic index returns to baseline
CONTACTS
─────────────────────────────────────────────────────────────
HABITECH DUTY ENGINEER .. CHANNEL 2 / HABITECH
DOME 1 COMMAND .......... CHANNEL 1 / COMMAND
────────────────────────────────────────────────────────────────
────────────────────────────────────────────────────────────────
PROTOCOL EVA-1 — EMERGENCY EVA RESPONSE
UNAUTHORIZED / DISTRESS EXTRAVEHICULAR ACTIVITY
════════════════════════════════════════════════════════════════
CLASSIFICATION .. HIGH
APPLICABLE ...... ALL INSTALLATIONS
LEAD DIVISION ... OPERATIONS / MEDICAL
TRIGGER CONDITIONS
─────────────────────────────────────────────────────────────
· Airlock alarm with no scheduled EVA on the log
· EVA personnel distress signal via suit comms
· EVA personnel overdue on scheduled return window
· Suit telemetry anomaly (pressure, O2, temperature)
RESPONSE PROCEDURE
─────────────────────────────────────────────────────────────
[1] Alert EVA Recovery Team — CHANNEL 3 / EVA-RESPONSE
[2] Dispatch standby recovery EVA team (minimum 2 persons)
[3] Confirm last known position via EVA tracking display
[4] Hold airlock in READY state for immediate re-entry
[5] Medical team: standby at airlock with emergency kit
[6] CMA notification if recovery exceeds 30 minutes
[7] Do not deploy additional personnel without EVA Lead
approval — risk of compounding cascade emergency
NOTE: Surface conditions at Kasei are extreme year-round.
EVA protocols are non-negotiable. No EVA is authorized
during dust storm index ELEVATED or above.
CONTACTS
─────────────────────────────────────────────────────────────
EVA CONTROL ............. CHANNEL 3 / EVA-CONTROL
MEDICAL CENTER .......... CHANNEL 4 / MEDICAL
DOME 1 COMMAND .......... CHANNEL 1 / COMMAND
────────────────────────────────────────────────────────────────
────────────────────────────────────────────────────────────────
PROTOCOL COM-1 — COMMUNICATIONS BLACKOUT
NODE FAILURE / SIGNAL LOSS EVENT
════════════════════════════════════════════════════════════════
CLASSIFICATION .. MODERATE
APPLICABLE ...... ALL INSTALLATIONS
LEAD DIVISION ... INFRASTRUCTURE
TRIGGER CONDITIONS
─────────────────────────────────────────────────────────────
· Primary uplink node offline or signal degraded below threshold
· Earth-side reports no response from settlement node
· Internal comms failure (CHANNEL 1 or 7 unresponsive)
· Solar storm or atmospheric interference event detected
RESPONSE PROCEDURE
─────────────────────────────────────────────────────────────
[1] Switch to backup relay — run RELAY-SWITCH on COMMS panel
Kasei backup node: MARS-KV1-SECONDARY
Artemis backup node: LUNA-ART-BACKUP
[2] Check solar storm index — ELEVATED means expect delays
[3] Internal comms failure: activate zone runner system
Zone leads use physical runners to Dome 1 Command
[4] Notify Earth via deep-space backup transmitter
Frequency: 8.425 GHz / Protocol BP-7
[5] Blackout exceeding 48 hours triggers full ops review
[6] Treat all pending CMA alerts as undelivered during
blackout — do not assume receipt
CONTACTS
─────────────────────────────────────────────────────────────
COMMS DUTY OFFICER ...... CHANNEL 6 / COMMS
DOME 1 COMMAND .......... CHANNEL 1 / COMMAND
────────────────────────────────────────────────────────────────
────────────────────────────────────────────────────────────────
PROTOCOL EVAC-1 — FULL SETTLEMENT EVACUATION
KASEI (KV-1) COMPLETE EVACUATION DIRECTIVE
════════════════════════════════════════════════════════════════
CLASSIFICATION .. CRITICAL — REQUIRES COMMANDING OFFICER AUTH
APPLICABLE ...... KASEI (KV-1)
LEAD DIVISION ... ALL DIVISIONS / CMA COMMAND
TRIGGER CONDITIONS
─────────────────────────────────────────────────────────────
· ATM-1 unresolved after 4 hours / array below 20%
· Multiple simultaneous dome breaches (HAB-1 cascade event)
· CMA Evacuation Order issued by Kasei Commander
· Catastrophic structural failure (3 or more domes compromised)
EVACUATION ASSEMBLY POINTS
─────────────────────────────────────────────────────────────
PRIMARY .......... Dome 1 — EVA Staging Area (Level 1)
SECONDARY ........ Level -2 — Emergency Shelter (cap. 400)
TERTIARY ......... Surface EVA Staging Pad
EMERGENCY LAUNCH . DSV Pad 1 (if LogiCo vessel in port)
KASEI SETTLEMENT — EMERGENCY EVACUATION MAP
─────────────────────────────────────────────────────────────
SURFACE DOMES:
┌──────────────┐ ┌──────────────┐ ┌─────────────┐
│ DOME 1 ├──A────┤ DOME 2 │ │ DOME 5 │
│ COMMAND │ │ LIFE SCI │ │ INDUSTRY │
│ ◄ EVA STAG. │ └──────────────┘ └─────────────┘
└──────┬───────┘
│ B
┌──────┴───────┐ ┌──────────────┐
│ DOME 3 │ │ DOME 4 │
│ RESIDENTIAL │ │ RESEARCH │
└──────┬───────┘ └──────────────┘
│ C
┌──────┴───────┐
│ DOME 14 │
│ RESIDENTIAL │
│ (E.EXPAND.) │
└─────────────┘
SUBSURFACE (via stairwells in any dome):
─────────────────────────────────────────────────────────────
LEVEL -1 ▸ Technical / Storage / MERIDIAN-9 Array Junction A
LEVEL -2 ▸ ██ EMERGENCY SHELTER — CAPACITY: 400 ██
⚠ PRIMARY ASSEMBLY: DOME 1 / EVA STAGING AREA
⚠ IF DOME 1 COMPROMISED: LEVEL -2 EMERGENCY SHELTER
⚠ LAST RESORT: SURFACE TRANSIT TO DSV PAD 1 (FULL EVA REQUIRED)
EVACUATION PROCEDURE
─────────────────────────────────────────────────────────────
[1] Proceed to nearest CORRIDOR transit tube immediately
Follow green emergency floor markers toward Dome 1
[2] Zone leads: full headcount at each assembly point
Report to Dome 1 Command via CHANNEL 1 within 30 min
[3] DoJoCo personnel (312): account to Division Leads
[4] Total settlement (2,247): CMA Command coordinates
[5] Full EVA suit required for any surface transit
[6] All non-essential systems suspended on evac order
⚠ EVACUATION ORDER IS NON-NEGOTIABLE. ALL PERSONNEL
COMPLY REGARDLESS OF ONGOING TASK OR ASSIGNMENT.
CONTACTS
─────────────────────────────────────────────────────────────
KASEI COMMANDER ......... CHANNEL 1 / COMMAND
CMA EMERGENCY ........... CHANNEL 7 / EVAC-ALPHA
LOGICO FLEET DISPATCH ... CHANNEL 5 / LOGICO
────────────────────────────────────────────────────────────────